NPE 2024 -- Yushin On Show MKA Series Large Robot
Tags: NPE 2024, Yushin Robot, Heavy Duty Robot, SWITEK Robot, Sepro Robot
NPE 2024 -- Yushin on show MKA series large robot with servo posture to demonstrate the flexibility and controllability in the production of large size plastic parts.
As a large robot with payload up to 50kg, the high light of the Yushin MKA Robot on show NPE 2024 not only with servo positure which enable the tools possible to turn 360° at any direction but also installed a quick change which enable the robot to change the different tools for the picking of different parts. This function is really powerful in some applications like parts picking + assembly. It'll enable the gantry robot to have the similar ability to a 6 axis servo industrial robot. It's amazing and we can see in NPE 2024 that not only Yushin but SPERO also demenstrated the same application with their large robot for the car parts industry.
As their follower, SW77 series of large robot produced by SWITEK Automation will also be able to be upgrade to a 6 axis servo injection robot with the pneumatic posture replaced by 3 axis servo posture + quick change. With a payload up to 75kg and support injection molding machine up to 4000T, SWITEK SW77 series robot is a price smart solution to production of large size plastic parts.
HXF290 -- Haixing High Precision Energy Saving Servo Injection Molding Machine
| No. | Name | Value |
|---|---|---|
| 1 | Clamping Force | 2900 kN |
| 2 | Shot Weight | 845 g |
| 3 | Shot Speed | 117 mm/s |
| 4 | Screw Diameter | 65 mm |
| 5 | Opening Stroke | 600 mm |
| 6 | Space Between Tie Bars | 640 x 640 mm |
| 7 | Mold Thickness (Min) | 220 mm |
| 8 | Mold Thickness (Max) | 650 mm |
| 9 | Pumper Motor | 36 kW |
| 10 | Heating Capacity | 24.2 kW |
PVC pipe fittings are one of the most commonly used connector in the drainage project and a cold runner designed mold is the most economic solutions for the production of the PVC pipe fittings, but the removal of the runner in result is a labour intensive work. Is there any economic way to remove the runners from the PVC pipe fittings automatically?
For the producer of PVC pipe fittings the most economic soluton to remove the runner is with an Air Nipper fixed to the picking robot immediately after the PVC pipe fittings picked out from the mould. The robot will drop the seperated pipe fittings and runner to different containers. Below configuration of SWITEK runner cutting solution for 16 cavities PVC pipe fittings for your reference:
The Air Nipper runner cutting system is an easy to start solution for the producers of PVC pipe fittings, which the Air Nipper would be controlled by the picking robot and is the best solution for the small size PVC pipe fittings (with a diameter around φ25mm). Anyway it also must be custom made according to the mold design.
For more solutions about the pipe fittings runner cuttings and other automation solutions please contact Adams from SWITEK, for a profound proposal of turn-key solutions of pipe fittings production.